Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

May 10, 2024

To Be Determined

Site Work

No Information to Display

$3,942,469.00

Public - County

img_map_placeholder

To Be Determined, Little Ferry, NJ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

In general, the project consists of removing, evaluating, rehabilitating, reinstalling, and placing into service six (6) existing raw wastewater pumps in Pump Building No. 1 at the Bergen County Utilities Authority (BCUA) Wastewater Plant in the Borough of Little Ferry, New Jersey. The pumps to be removed, evaluated, rehabilitated, reinstalled, and placed back into service are labeled as follows: 1-2, 1-3, 1-5, 1-6, 1-7, & 1-1. Pump 1-4 is not included in this evaluation. Existing pump motors are not included in this evaluation or rehabilitation and are to remain onsite

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects