Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 11, 2023

November 15, 2024

Madison St

Outdoor Lighting, Paving, Site Work

No Information to Display

$7,124,630.00

Public - City

img_map_placeholder

Madison St, Oak Park, IL

Subscribe to View Full Documents

Madison Street Improvements Est. Completion Date: Nov. 5, 2024 Pre-Qualification: Yes In general, this contract includes removal of roadway, curb/gutter, sidewalk, brick pavers, driveway, lighting, and landscaping/ trees. Other elements include milling and resurfacing of HMA pavement, new brick pavement, new HMA pavement, water main removal/replacement, new water main, new lighting, landscape restoration, planting trees, curb/gutter, sidewalks, driveways, pavement marking, signage, drainage/utility lid adjustments, traffic loops/handhole modifications, maintenance of traffic, and all incidental and collateral work necessary to complete the project as shown on the plans and special provisions. The Village of Oak Park reserves the right to issue plans and specifications only to those contractors deemed qualified. All prospective bidders must prove they are pre-qualified by the Illinois Department of Transportation by uploading a certificate of eligibility when submitting their bid. This project is financed with local Village funds and Illinois Department of Commerce and Economic Opportunity (DCEO) grant funds. The work to be performed pursuant to this Proposal is subject to all state rules, regulations and guidelines including the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq., and Equal Opportunity requirements. Contractor will be required to comply with the Business Enterprise Program (BEP) for Minorities, Females, and Persons with Disabilities Act (30 ILCS 575/0.01 et seq.). This project will have a BEP utilization goal set by DCEO for a percentage of the grant dollars going to businesses that have been certified as owned and controlled by persons who are minority, female or who have disabilities. Contractors are required to reach the utilization goals or show good faith efforts to reach the utilization goals. See project manual for details. Non-compliance with the BEP goal and requirements will disqualify the bid.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.