Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2023

December 1, 2023

June 30, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$986,811.00

Public - City

img_map_placeholder

Multiple Locations, Bradley, IL

Subscribe to View Full Documents

The Village of Bradley is requesting Sealed Bids for the proposed 2023 Alley Reconstruction Improvements. Proposed Improvements: Alley reconstruction improvements at various locations throughout the Village. Prevailing Wage Rates Apply The following adjustments, revisions, and clarifications are hereby incorporated into the plans, specifications, and contract documents: 1. A pay items for HMA Pavement Patching has been added. This pay item will be used for HMA areas behind proposed curbs at driveways and for curb slots at road intersections. Please use that attached Schedule of Prices and see the revised special provision page for details on the cross section. 2. The Schedule of Prices was revised for the following quantities. Please use the revised schedule for bidding. a. Geotechnical Fabric b. Aggregate Base Course Type B c. HMA Binder Course d. HMA Surface Course Proposed Improvement This project consists of removal of existing alleys, drives, curb and gutter removal, and sidewalk removal. Improvements include alley reconstruction, driveway reconstruction, storm sewer construction, curb and gutter construction, sidewalk construction, and manhole frame adjustments, trench backfill, and restoring disturbed areas This project consists of pavement removal, driveway removal, curb and gutter removal, and sidewalk removal. Proposed improvements include new alley pavement, driveway reconstruction, storm sewer construction, curb and gutter, sidewalk, manhole adjustment, valve adjustment, and restoration of disturbed areas.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.