Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 17, 2023

February 13, 2024

555 Wright Way

Renovation

No Information to Display

$361,000.00

Public - State/Provincial

img_map_placeholder

555 Wright Way, Carson City, NV

Subscribe to View Full Documents

A. This section of the specifications provides a general summary of the work of this project and highlights areas of responsibility which are deemed to warrant special attention. This section supplements other sections of these specifications, which address these items in more detail. B. The work of this Section of the specifications includes providing labor, tools, equipment, supplies, and materials unless otherwise specified, and in performing operations necessary for the installation of the complete Electrical System as required by these specifications or shown on the drawings, subject to the terms and conditions of the Contract. C. When a requirement is established in any section of the drawings or the specifications it shall be applicable to the entire project, regardless of whether or not such requirement is repeated at every opportunity throughout the construction documents. D. The work shall include the completion of details of electrical work which are not described or shown, but which are necessary for the successful operation of electrical systems described on the drawings or required by these specifications. E. The work shall include the providing, without exception and without specific enumeration in the design documents, all elements which are generally found to be included in the electrical system of a similar or representative project. Replace Exterior Campus Electrical Service Entrance (Department of Motor Vehicles, Carson City) (SPWD Project No. 21-M29) Site Directions: 555 Wright Way, Carson City, Nevada 89711 Base Bid Description: Replace utility primary, main electrical service entrance switchboard, underground feeder, and transformers at the Carson City Department of Motor Vehicles per plans and specifications. Contract Time: 88 calendar days. Liquidated Damages: $300.00 per day. Prevailing Wages must be paid on this project.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.