Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 20, 2023

July 1, 2024

6545 Swaney Rd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

6545 Swaney Rd, Bluffton, OH

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

One-time bid pricing for furnishing of combination signal supports and bracket arms, in accordance with the Departments specifications and procedures for Combination Signal Supports and Bracket Arms. 4 each - Combination Signal Support, Type TC-81.22, Design 13 4 each - Bracket Arm, 15 Delivery shall be made by 7/1/24. All deliveries shall be coordinated to ensure proper storage and hand-off methods are in place. Deliveries must be between the hours of 8:00 a.m. and 3:00 p.m., Monday through Friday, excluding State of Ohio holidays, unless special permission is granted by the Department to temporarily waive or adjust this requirement. For details on Specifications and Procedures for Signal Supports and Bracket Arms, see bid items. The supports shall be shipped with each supports associated hardware separately boxed/crated labeled, packaged, and secured. This includes all hardware except the foundation anchor bolts, washers, and nuts. Manufacturers recommended anchor bolts shall be delivered in bundles. A bundle shall consist of all required anchor bolts and mounting hardware. The mounting hardware shall be installed on each bolt when shipped. The supplier shall notify the point of delivery date and time at least five (5) days in advance of the day of delivery or at the time of loading prior to shipment, whichever is sooner. This notification is needed for the Department to coordinate equipment to unload the shipment at the delivery location. An itemization of all delivered parts shall be provided with each shipment. OH DOT - Signal Supports Question Cuttoff Date & Time 10/16/2023 04:00:00 PM (ET)

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.