Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 17, 2023

June 14, 2024

43 N Main St

Paving, Site Work

No Information to Display

$331,670.00

Public - State/Provincial

img_map_placeholder

43 N Main St, Brigham City, UT

Subscribe to View Full Documents

The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project: Brigham City Court Sidewalks and Ramps Replacement Administrative Office of the Courts 43 North Main Street, Brigham City, Utah 84302 The base bid portion of the project will consist of the demolition and replacement of existing exterior concrete stairs, ramps, hand railings, and sidewalks. The base bid has two (2) phased areas of work. Question Submission Close Date: 10/6/2023 3:00 PM MDT ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS PROJECT If you need more information on this event, please contact: Carl Francis jcfrancis@utah.gov All documents should be attached as separate files. For questions relating to U3P, please email sciquestadmin@utah.gov.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.