Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 31, 2024

No Information to Display

13750 96 Ave

Addition, Renovation

No Information to Display

$8,000,000.00

Public - State/Provincial

img_map_placeholder

13750 96 Ave, Surrey, BC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Surrey Memorial Hospital (SMH) MRI Replacement and Expansion Project for 2 MRI Units. Add a new MRI Unit (# 2) to SMH, alongside the existing MRI Unit (# 1). Construction will be conducted in phases to ensure the ongoing operation of the existing MRI Unit (# 1). TIMELINE: Request for Proposals for prime (Architectural) consultant services for the project has closed and a preferred proponent has been chosen. The successful Proponent will act in the capacity of a Managing Consultant (Architect) for the Project, including engaging the services of all Sub-Consultants as required to provide complete consulting services for the Project, except that the Authority will engage a professional quantity surveyor, ETS-LINDGREN, and if required geotechnical and environmental consultants and Certified Professional, including working in collaborate with the successful Vendors' Technical PM and FH IMIT. Services to be provided by the Managing Consultant and Sub-Consultants will include: architectural, structural, mechanical, electrical, code, acoustic, building envelope, door hardware as required. *The Project's construction budget will be determined when the Proponent has completed the Feasibility Study and Schematic Design to inform a CLASS C Budget.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.