Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

July 1, 2024

21193 Malta Rd

Renovation

No Information to Display

$131,131.00

Public - City

img_map_placeholder

21193 Malta Rd, Malta, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Caukin Automotive Lower Roof Replacement. Scope of work: The project involves the replacement of the existing roofing system at Caukin Automotive on the Kishwaukee College Campus. The selected contractor shall provide the following services: 1. Prepare for new roof *Remove any organic material and slice existing roof. 2. Wood nailers: *Add wood nailers as necessary to provide secure attachments points for the new roofing system. 3. Insulation *Mechanically fasten one layer of 1.5" isocyanurate insulation over the existing roof to improve thermal performance. 4. Tapered Insulation: *Install tapered insulation along the gutter to ensure proper water drainage and prevent ponding. 5. New roof installation *Install a black 60 mil EPDM roofing material adhering to the manufacture's specification and industry standards. 6. Prefinished Metal Edge: *Provide and install new prefinished metal edge at the perimeter of the roof for a clean finish and improved durability. 7. Gutters and downspouts: *Supply and install new gutters and downspouts to ensure efficient water drainage away from the building. 8. Provide walk off tile's *150' of walk off tiles to Rtu4, Caukin upper roof ladder, and Caukin mid roof ladder. 9. Warranty: *Furnish a twenty-year manufacturer's warranty for the roofing materials used in the project. 10. Disposal *Contractor is responsible for removal of all debris

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects