Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

November 9, 2023

No Information to Display

4935 Woolper Rd

Demolition, Site Work

No Information to Display

$9,347.00

Public - County

img_map_placeholder

4935 Woolper Rd, Petersburg, KY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Demolition of Structures on Woolper Road Site Directions: The Work is located at 4935 Woolper Road in Petersburg within the Owner's service area in Boone County, Kentucky. The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to remove and dispose of all above grade structures and site debris on the parcel as shown on the Bid Documents. Description of Project The objective of this project is to remove and dispose of the two structures and all site debris including the chain link fence on the parcel located at 4935 Woolper Road in Petersburg, KY. There are two (2) structures on the property along with miscellaneous debris. The property is owned by SD1, and the bidder is encouraged to visit the site prior to submitting a bid. Scope of Work The awarded bidder shall furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment, and services, including utility and transportation services, required to complete all Work for the demolition and removal of all structures and debris. The lump sum bid shall include all costs associated with demolition, permit fees, dumping fees, cost of insurance requirements, waste disposal costs or fees, city license fee, rental costs of equipment, and any other costs incurred while performing the Work. All salvage materials resulting from Work under this contract and located within the specified areas will become the property of the Contractor. All utilities have been disconnected. The contractor will preserve in operating condition all active utilities traversing the areas where demolition and removal work is to be done, protecting electric conduit/lines, utility poles, and other appurtenances. The foundation located below grade does not need to be removed. Common fill material shall be used to backfill below grade structures exposed where material has been removed. Fill material can be onsite material or brought in material. Site should be graded so that the direction of flow is not changed from the original grade and the site drains properly. Burning of any debris or waste is prohibited. The Contractor shall follow all Federal and State regulations and laws if/when removing any hazardous material or waste. Question Deadline 09/27/2023

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.