Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

January 5, 2024

7943 Brock Bridge Rd

Renovation

No Information to Display

$620,000.00

Public - State/Provincial

img_map_placeholder

7943 Brock Bridge Rd, Jessup, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Maryland Department of Public Safety and Correctional Services (DPSCS or Department) is soliciting bids to procure the following: Repair and refinish the gym floor inside the Maryland Correctional Institution Women, located at 7943 Brock Bridge Road. Jessup, MD 20794. The contractor shall furnish all labor, material, tools, equipment, supervision, permits, Insurance, etc., necessary to provide the repair of the above service. Contract shall be completed within 60 days from award. Small Business Reserve Designation: Yes Scope of Work: 1. It will be the responsibility of the Contractor to tear out water damaged hardwood to access the subfloor, which is approximately 70-100 square feet*. The Contractor must also remove and replace all black vent cove around the gymnasium and dispose of accordingly (approximately 400 linear square feet*). 2. The Contractor shall supply all materials, including, but not limited to, plywood, pins for possible subfloor repair, maple flooring (approximately 70-100 square feet*), generators to run sanders, and sealant for the new wood. 3. The Contractor shall sand, seal, and finish approximately 7,500 square feet* of hardwood flooring. 4. The Contractor shall tape and paint lines for both the volleyball and basketball courts. The Contractor shall also install a facility provided logo in the center of the floor (please note this will be provided by the facility). 5. Once the Contractor completes the lines and logo on the new surface it must be recoated and sealed. 6. The Contractor shall install new black vent cove on the bottom of the walls around the gymnasium floor, replacing what was removed (approximately 400 linear feet*) 7. The Contractor shall be responsible for all work to be completed in accordance with standard practices for this type of work. The Department must approve of the work once finished.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.