Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2023

November 3, 2023

November 24, 2023

Multiple Locations

Renovation

No Information to Display

$15,491.00

Public - County

img_map_placeholder

Multiple Locations, Tacoma, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Having carefully examined all QUOTE DOCUMENTS prepared by Pierce County, as well as the premises and conditions affecting the work, the Undersigned proposes to furnish all labor, equipment, and materials and perform all work, in accordance with the terms & conditions and prevailing wage requirements attached, which price is hereby designated as to the total proposal price for all necessary work. Bonds and Retainage A bid bond will not be required for this work. For Public Works contracts less than or equal to $50,000 including tax and purchase services contracts which include services requiring the payment of prevailing wages less than or equal to $50,000 including tax, the County shall waive retainage and bonding but will retain the right of recovery against the Contract for any payments made on the Contractor's behalf. Question Submission Deadline:October 2, 2023, 2:00pm CDM# 8723 Job Specifications This project is a two-story site built home located in Puyallup, Washington. The residence was built in 1978 and is in good condition. The residence is 2006 SqFt. Roof is composition and is in good condition. Combustion appliances exist in the home and combustion safety protocols are expected. Testing in & out daily. Pierce County Human Services staff will meet winning bidder on-site prior to work beginning. Installation of weatherization measures outlined in attached pricing spreadsheet. Work includes electrical measures. All work is subject to local codes and jurisdictional rules. Lead-safe work practices are expected. Contractor will perform all work outlined in scope. Subcontractors are allowed. The contractor is responsible for obtaining any and all necessary permits. The contractor is responsible for filing intent/affidavits. Pursuant to weatherization program rules; no sales tax will be charged on materials installed. Installation must meet the Department of Commerce requirements for weatherization. The Contractor shall provide material warranty and specifications to the County and homeowner.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.