Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

No Information to Display

201 S Union St

Demolition, New Construction, Site Work

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

201 S Union St, Montgomery, AL

Subscribe to View Full Documents

Per addendum 2 bid date is now 2pm As of September 26, 2023, there are no plans yet. The Work of this project includes, but is not limited to: Site Security, Existing Utility Removal, Site Demolition/Removal, Erosion Control, Storm Water Management, Site Grading, Storm Drainage, Stone Working Surface, Building Pad Development. Coordination and supervision of the entire project; and all related work, as indicated in the Bid and Contract Documents. A cashier's check or bid bond payable to Retirement Systems of Alabama in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and Material Payment Bonds, insurance in compliance with requirements, and verification of E-Verify enrollment (also with Proposals), will be required at the signing of the Contract. Bid documents may be examined at the office of the Construction Manager, 531 Oliver Road, Montgomery, AL and/or request made to the Construction Manager, Attention Trey Hard, (334) 657-7981 thard@jescoinc.net and Vanessa Meade, (334) 277-2612 vmeade@jescoinc.net for bid package documents. The Contractor and the RSA will be required to apply for Certificates of Exemption with the Alabama Department of Revenue which will handle administration of the Certificates. The Contractor shall account for the tax savings on the Proposal Form. Additional qualifications and requirements for General Contractor Bidders and separate Subcontractors are indicated in the Bid and Contract Documents. The RSA reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the RSA will thereby be promoted. Retirement Systems of Alabama Montgomery, Alabama GOODWYN MILLS CAWOOD, LLC MEMBERS, AMERICAN INSTITUTE OF ARCHITECTS 2660 EastChase Lane, Suite 200 Montgomery, AL 36117

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects