Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

July 10, 2024

To Be Determined

Site Work

No Information to Display

$1,199,050.00

Public - City

img_map_placeholder

To Be Determined, Orange, TX

Subscribe to View Full Documents

This project provides for replacement of an inverted siphon structure, known as the E. Wynn Siphon, which conveys freshwater within the SRA canal system under and across an existing drainage ditch. The existing structure is damaged and is undersized. This project will provide for the construction of two new 72 steel pipe inverted siphons and one future siphon stubout with new concrete headwalls and the realignment of the canal to the new siphon locations. The right is reserved by the SRA, as its interest may require, to accept or reject any or all bids, and to waive any informality in the bids received. Bid Security, only in the form of 1) a certified or cashier's check drawn on a Texas bank and made payable to the SRA; or 2) a bond executed by a surety company authorized to do business in Texas, in the amount of not less than five (5%) percent of the total bid, must accompany each bid at the time it is submitted. Contractors for this project must pay no less than the prevailing wage rates for the area established by the Owner and included in the Contract Documents. Bids may be held by the SRA for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. Upon award, the successful bidder will be required to furnish payment and performance bonds. . Questions received after Wednesday, October 4, 2023 will not be answered and responses from the engineer will not be given after Friday, October 6, 2023. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.