Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2023

October 31, 2023

February 29, 2024

415 Summer Street

Renovation

No Information to Display

$44,000.00

Public - State/Provincial

img_map_placeholder

415 Summer Street, Boston, MA

Subscribe to View Full Documents

The project is to convert an existing concession and pantry area within the Boston Convention and Exhibition Center to a podcast studio. The existing space is located on Level 1 and is entirely interior to the BCEC. The existing concession fixtures furniture and equipment will be removed along with any plumbing and electrical feeds back to the vertical risers or panelboards serving the concession and pantry. Question Deadline 09/29/2023 at 5:00 PM ET Send to: bflynn@massconvention.com Filed sub-bids will be required and taken on the following classes of work: ELECTRICAL (Estimate $50,900); HVAC (Estimate $25,725). MBE Participation 4.7% WBE Participation 9.3% PROJECT NUMBER: R39

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.