Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 15, 2023

No Information to Display

135 Warren Ave

New Construction, Site Work

No Information to Display

$85,000,000.00

Public - City

img_map_placeholder

135 Warren Ave, Brockton, MA

Subscribe to View Full Documents

Prequalified Bids of Trade Contractors for a new 226,265 GSF public safety headquarters. Provide labor, materials, and equipment necessary to construct the exterior water system complete, including connections to existing pipelines and testing, all as indicated on the Drawings and as specified, including but not limited to the following: 1. Installation of ductile iron pipe, fittings, accessories, and appurtenant work, at the locations and to the lines and grades indicated on the Contract Drawings. 2. The installation of hydrants, gate valves and boxes and concrete thrust blocks. 3. Furnishing and installation of all materials required to connect to existing water mains, replace existing services, install new gate valves, remove existing gate valves, install corporation cocks, saddles, curb stops, service boxes, and abandoning of the existing water system (if applicable), all as shown on the Contract Drawings. All valves, 24 inches and larger shall be butterfly valves. All abandoned pipes shall be cut and capped at the main. 4. In accordance with 528 CMR 11.00, work on the fire protection system, including hydrants and exterior underground piping, shall be performed by a Licensed Fire Protection Sprinkler Systems Contractor. The fire protection exterior underground piping will terminate at the valved tee connection to the water distribution system. The tee and valve will not be considered part of the fire protection system work.

53 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.