Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

December 25, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

Multiple Locations, San Antonio, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Install and test procured backup power systems including installation of generators, switchgear, switchboards, transformers and master control system. Construction of equipment foundations and pads. Electrical duct banks, circuitry, interconnections, terminations, and other miscellaneous improvements. Facilitation and coordination of complex, expedited and limited duration site shutdowns to tie-in and transition electrical service. Electric utility coordination. Furnish and construct buildings including all architectural and mechanical accessories. Furnish and construct steel frame shade canopies for electrical equipment. Furnish and install natural gas pipe and associated appurtenances. Civil work including earthwork, paving, grading, fencing, and other associated site work. Furnish and install new security system, security access panel and security cameras. The San Antonio Water System for the installation of backup power generation equipment and related site and electrical improvements at fifteen (15) production facility sites for the Emergency Preparedness Plan Implementation Natural Gas Generator Equipment Installation (the Project). Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashiers check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). In order to receive any information or documents for this SAWS requires that you sign a Firm NDA.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.