Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 1, 2024

December 15, 2024

Fresh Pond Pkwy & Brattle St

Paving, Site Work

No Information to Display

$1,225,000.00

Public - State/Provincial

img_map_placeholder

Fresh Pond Pkwy & Brattle St, Cambridge, MA

Subscribe to View Full Documents

Lowell Memorial Park:Site preparation, grading, pathway paving, wall repair, tree removal and pruning, planting, irrigation, lighting, and site furnishings Written Questions shall be submitted BY October 13, 2023 at 12:00PM to: Attn: Wendy Pearl, Project Manager The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises ("VOBE") on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Work covered by this contract includes but may not be limited to site-work; construction; reconstruction; alterations; remodeling or repair of the public works Project described in this paragraph 1.03 including the following major work: 1. Turf improvements 2. Removal of existing, dead, dying, or other trees 3. Selective pruning of existing trees to remain 4. Installation of tree, shrubs, and groundcover plantings 5. Installation of new site lighting, including electrical conduit 6. Installation of site furnishings, including signage 7. Installation of concrete walkways 8. Restoration/rebuilding of existing brick walls & pier with limestone capstones 9. Substantial Completion date is September 30, 2024 10. Final Completion date is December 15, 2024.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.