Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

December 11, 2023

February 9, 2024

39 Chestnut St

Renovation

No Information to Display

$97,000.00

Public - City

img_map_placeholder

39 Chestnut St, Ludlow, MA

Subscribe to View Full Documents

The work under the Contract consists of 1. Install new luxury vinyl plank (LVP) flooring and rubber base in common areas including hallways, lobby, laundry room, elevator, and stairways where shown on the drawings 2. Remove existing flooring except where shown to be covered with new underlayment. 3. Also remove "L" shaped half walls in entrance lobby on Chestnut Street side and patch the rough floor as may be appropriate prior to installing new floor finish 4. Bidders are reminded that not every detail of construction can be shown on the drawings and that not every part of every assembly can be listed in the specifications. The owner assumes that bidders are experienced tradesman who estimate and supply all the required materials for their trades as having visited the site prior to bidding. 5. Protect all existing finishes to remain during construction. Contractor is responsible for repairing any and all existing finishes damaged during construction to the owner and architect's satisfaction. 6. All contractors are to field verify all existing conditions and dimensions prior to bidding. Any discrepancies are to be reported to the architect immediately. The job site will be available for inspection at 10 a.m. on Wednesday, November 1, 2023. Replace Common Floor Areas, Chestnut Street Elderly Housing 667-3 Development 39 Chestnut Street, Ludlow, MA 01056 The Project consists of removal of VCT and replacement with LVP flooring in hallways. Estimated Cost $97,000 STATE-AIDED DEVELOPMENT: 667-03 Development

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects