Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2023

November 13, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$35,160.00

Public - City

img_map_placeholder

Multiple Locations, Topeka, KS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This project consists of removal and replacement of failing concrete pavement panels and adjacent curb & gutter sections on SW 17th Street from SW Clay Street to SW Tyler Street. The failing concrete pavement panels and curb & gutter sections are located in the eastbound lane at both sites. One lane of traffic in each direction on 17th St. must be maintained at all times during construction. Exact project limits will be marked by the Construction Inspector prior to the beginning of construction This project consists of removal and replacement of failing concrete pavement panels and adjacent curb & gutter sections on SW 17th St. There are two locations for this project - Site 1 is located west of Clay St. and Site 2 is located east of Tyler St. All quantities included in the bid items are estimated. The City reserves the right to increase or decrease the project quantities based on actual conditions on-site, with the expressed understanding that no adjustment in unit prices will be made. The schedule for this project is critical. The Work will commence as soon as practical with the issuance of a Start Work Order. Substantial Completion of the Work will be within 14 days from the date the Start Work Order is issued, and completed and ready for Final Completion and payment within 7 days from the date when Substantial Completion is achieved. It is anticipated that construction at both sites will occur simultaneously in order to meet this schedule. Question Deadline 10/04/2023 at 10:30 PM CT

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.