Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

August 12, 2024

971 Airport Rd

Renovation

No Information to Display

$350,000.00

Public - County

img_map_placeholder

971 Airport Rd, Copperhill, TN

Subscribe to View Full Documents

TDOT-AD PROJECT IDENTIFICATION No. 70-555-0122-22 The scope of the project is to provide improvements to the Main Hangar and Terminal Facilities at Martin Campbell Field in Copperhill, TN. the Contractor shall provide exterior improvements, structural and electrical improvements - provide demolition and replacement of metal roof panels and insulation, metal siding panels and insulation; provide exterior door and window replacement; provide translucent wall panels and support structure at North and South Hangar walls; provide all structural improvements; provide electrical upgrades in Hangar Area including main distribution panel, lighting, and switching; provide hangar door repairs; provide fire extinguishers; and restore any finishes damaged in the work to match existing. Work not noted as Alt. 1 or Phase II is Base Bid. Alternate 1 (Alt.1) - the Contractor shall provide ADA improvements - provide all work associated with the Toilet Rooms including heating and ventilation, lighting, plumbing renovations, finishes, and accessories. Provide all work associated with ADA site improvements including sidewalks, parking, and grading. Phase II (N.I.C) - Work specifically noted as Phase II work is Not in this Contract for Construction. Work within the contract for construction shall be coordinated with this work and not prevent Phase II work from being provided in the future. Phase II work includes Hangar/Terminal wall improvements and fire rating upgrades, additional terminal area electrical, lighting, and HVAC improvements; terminal area finish upgrades (not in Alt. 1), and additional Hangar egress Construction Time Limits - The Contractor will be required to achieve Final Completion in 270 calendar days per the Notice to Proceed. The Contractor will have 60 days for submittals and lead time, 180 days for on-site work to achieve Substantial Completion, and 30 days to achieve Final Completion and readiness for final payment. Liquidated damages will be $500.00 per day for each day after the expiration of the construction time. Martin Campbell Field 971 Airport Road Copperhill, TN 37317 Bids shall be accompanied by a certified check or bid bond payable to Polk County Commission, in an amount not less than five percent (5%) of the total amount of the Base Bid and Additive Alternates (if applicable). The Polk County Commission reserves the right to reject any and all bids.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.