Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

January 1, 2024

No Information to Display

Multiple Locations

Addition, Renovation, Site Work

No Information to Display

$10,600,000.00

Public - County

img_map_placeholder

Multiple Locations, Bedford, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bedford County Public Schools (BCPS) has received and accepted an unsolicited proposal under the Public-Private Educational Facilities and Infrastructure Act (PPEA) for additions, renovations and improvements to Liberty High School, Staunton River High School and Bedford Primary. Please contact Charles Santore charles.santore@bedford.k12.va.us for more details. It is expected any interested vendor that proposes on this project will use their knowledge and experience to develop a plan to generally incorporate the outlined needs. BCPS is interested in innovative ways to accomplish these plans that are practical and cost effective. Vendors proposing on this project would also need to provide a plan to accommodate and manage student learning and the activities while this work is underway including logistics, costs, and schedules. Construction of this project is anticipated to begin in the Summer of 2024 and achieve substantial completion based on a reasonable construction timeline. It will require close coordination with School officials to accommodate normal school year operational schedules. Time must be included in the schedule to allow school staff to complete preparations for the start of school at the end of each summer. Plans must include consideration of students occupying the current site as construction progresses. The school staff will also require some time to relocate all material and equipment between areas of the building, including technology equipment. Questions concerning the technical requirements of this RFP may be referred to: Charles Santore, charles.santore@bedford.k12.va.us Questions concerning the RFP documents may be referred to: Randy Hagler, rhagler@bedford.k12.va.us

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.