Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

November 20, 2023

December 1, 2024

N Texas Ave

Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

N Texas Ave, Bryan, TX

Subscribe to View Full Documents

The right to accept any bid or to reject any or all bids and to waive all formalities is hereby reserved by Bryan Texas Utilities. Question Deadline 10/17/2023 at 5:00 PM CT all questions or clarifications related to this Request for Bid shall be addressed in writing, via the Brazos Valley Online Bidding System This project consists of relocating approximately 1.5 miles of two (2) 12.5 kV, overhead electric distribution feeders on Texas Avenue from Coulter Dr. to Villa Maria Road. The newly relocated distribution line will consist of a combination of overhead and underground construction. Typically the overhead power lines will be moved to streets adjacent to Texas Avenue while the underground power lines will be along Texas Avenue in an easement. The contractor will provide labor and equipment to install the following items: I. Approximately 13,950' of directional bores including multiple 2", 3", and 4" HDPE conduits which will ultimately have primary cable, installed in them with some spares. II. Approximately 1,950' of directional bores including multiple 2", 3", and 4" HDPE conduits which will ultimately have secondary cable, installed in them with some spares. III. Approximately 400 of three (3) 4 Schedule 40 PVC conduit installed by trenching minimum depth 60". IV. Approximately 75 of six (6) 4 Schedule 40 PVC conduit installed by trenching minimum depth 60". V. Approximately 500 of one (1) 2 Schedule 40 PVC conduit installed by trenching minimum depth 60". VI. Approximately 50 of two (2) 2 Schedule 40 PVC conduit installed by trenching minimum depth 60". VII. Approximately 250 of three (3) 2 Schedule 40 PVC conduit installed by trenching minimum depth 60". VIII. Eleven (11) two source two load 15 kV pad-mounted switchgears. IX. Two (2) three source one load 15 kV pad-mounted switchgears. X. Three (3) 4' x 6' x 6' fiberglass composite pull-boxes. XI. Five (5) Three-Phase 1000 MCM Al 15 kV risers on new power poles. XII. Five (5) Single-Phase 1/0 Al 15 kV risers on new power poles. XIII. Ten (10) Three-Phase 1/0 Al 15 kV risers on new power poles. XIV. Two (2) Three-Phase 1/0 Al 15 kV risers on new power poles. XV. Approximately 29,900 of 1000 MCM Cu 15 kV primary cable install in one (1) 4" conduit with terminations. XVI. Approximately 21,900 of 1/0 Al 15 kV primary cable installed in one (1) 2" conduit with terminations. XVII. Forty-Three (43) 45' Class 2 wooden poles with crossarms and hardware. XVIII. Eight (8) 45' concrete poles with crossarms and hardware. XIX. Twenty-Two (22) 50' Class 2 wooden poles with crossarms and hardware. XX. Fourteen (14) 50' concrete poles with crossarms and hardware. XXI. One (1) 55' concrete pole with crossarms and hardware. XXII. Approximately 13,200' of 477 AAC overhead distribution conductor. XXIII. Approximately 4,400' of 4/0 ACSR overhead distribution conductor. XXIV. Approximately 7,600' of 1/0 ACSR overhead distribution conductor. XXV. Twelve (12) "Open-Wye Open-Delta" transformer banks at various kVA sizes. XXVI. Ten (10) "Wye-Wye" transformer banks of various kVA sizes. XXVII. Sixteen (16) single-phase transformer of various kVA sizes.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.