Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2023

November 24, 2023

March 21, 2024

Multiple Locations

New Construction, Site Work

No Information to Display

$2,864,143.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Raleigh, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Submit Written Questions Vendor September 18, 2023, by 2:00 pm ET Please attend the Pre-bid Conference prior to submitting questions. Provide Response to Questions (Addendum via Sourcing Tool) State September 19, 2023 Written questions shall be either submitted via the Message Board of the Sourcing tool or emailed to angie.dunaway@ncdps.gov by the date and time specified above. Vendors should enter "19-IFB-814864032-DAD Modular Questions" as the subject for the email All projects will require 100% performance and payment bonds, individually or as a whole, after issuance of the Work Order (WO) and prior to the Notice to Proceed (NTP). A NTP will be issued following the review and approval of bonds along with construction documents required by NCORR. Failure to submit bonds 5 calendar days after the issuance of the Work Order (WO) will result in default of the contract. NCORR reserves the right to issue a NTP at any point in time. Contract Award State As soon as possible after evaluation of offers. Vendor must begin work no later than 60 calendar daysfrom contract award (which shall include obtaining consent to perform the work, permitting, surveying, temporary utilities, etc.) and complete the awarded projects within the contracted time (subject to environmental remediation). Construction shall not exceed 105 calendar days from issuance of the Work Order to issuance of Certificate of Occupancy ("COO") from AHJ for Modular housing. Construction shall not exceed 115 calendar days from issuance of Work Order to issuance of Certificate of Occupancy ("COO") from AHJ for modular housing plus elevation.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.