Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 15, 2023

February 13, 2024

Multiple Locations

Site Work

No Information to Display

$650,000.00

Public - County

img_map_placeholder

Multiple Locations, Scottsburg, IN

Subscribe to View Full Documents

**Per Addendum 1 the bid date has been extended from 10/06/2 to 10/17/23** Installation of approximately 2,860 LF of 6-inch SDR 21 Force Main, plus or minus 68 LF of 8-inch SDR 35 gravity sewer; demolition of an existing tank in the Total Concept Mound System, a sanitary manhole, a 6-foot diameter pre-cast lift station and valve vault and all other necessary equipment required to construct the Project as presented in the construction drawings. Bid shall include all implicit and explicit labor, equipment, and ancillary items required to develop a fully functional system. Work shall be constructed under a Unit Price Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement. No consideration of price escalation will be given; therefore, Contractors are advised not to include any such escalation clauses in their proposal for this Project. Any contract or contracts awarded under this Advertisement for Bids is expected to be funded by a State Revolving Fund (SRF) Loan, administered by the Indiana Finance Authority (IFA). The Contractor to whom the work is awarded shall comply with all requirements of said agencies. Where conflict exists between this Specification and the agency specifications, the more stringent shall apply. Question Deadline 10/06/2023 at 5:00 PM ET

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects