Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

December 19, 2023

August 31, 2024

To Be Determined

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Orangeville, UT

Subscribe to View Full Documents

County: beaver This project requires using the electronic certified payroll program. See attachment to notice to contractors. This is a working p+t (price + time) project. The department will not hold retention on this project. Per utah state code â§ 13-8-5 (1) prime contractors cannot hold retention. Refer to utah code â§ 13-8-5 (1) for more information. Engineer's estimate: Greater than $500k but less than or equal $1.5m UTDOT - Navajo Trail Bridge Replacement #001010C Off-System Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.