Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 25, 2023

October 31, 2025

10425 Norden Ave

Paving, Site Work

No Information to Display

$30,933,343.00

Public - County

img_map_placeholder

10425 Norden Ave, Rancho Cordova, CA

Subscribe to View Full Documents

The scope of this project consists of rehabilitating PCC and AC pavements of Runway 4R-22L at Mather Airport. The work includes: Remove existing PCC pavement, Remove existing AC pavement, Install crushed aggregate base course, Construct asphalt emulsified recycled base course, Install bituminous asphalt pavement, Install Portland cement concrete pavement, Install pavement markings, Install centerline and touchdown zonez light cans and electrical conduits. As of September 19, 2023, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. Question Deadline 10/06/2023 at 12:00 PM PT Question Response Deadline:October 13, 2023, 11:55pm Direct pre-bid questions to the Project Manager, Kathy Sutton, via the Q&A tab in the portal. BID QUESTIONS MUST BE SUBMITTED IN WRITING. Questions received after that time will not be answered. Responses will be by addenda to the bid documents. In Phase 1 we calculated approximately 2,000 CY Total between Bid Items 14 (5,390 CY) and 47 (40 CY), a difference of approximately 3,430 CY. In Phase 2 we calculated approximately 500 CY for Bid Item 26 (1,150 CY), a difference of approximately 650 CY. In Phase 3 we calculated approximately 1,000 CY for Bid Item 39 (5,890 CY), a difference of 4,890 CY

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects