Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

No Information to Display

1102 Coliseum Dr

Outdoor Lighting, Site Work

No Information to Display

$394,494.00

Public - State/Provincial

img_map_placeholder

1102 Coliseum Dr, Tuscaloosa, AL

Subscribe to View Full Documents

Prequalification submissions must be received by 5:00 PM local time Tuesday, October 3, 2023. Late submittals will not be accepted. For questions regarding this project, please contact UA Project Manager Lane Weaver/Alexa Moates at 205- 348-0919/205-348-6913 or lrweaver2@ua.edu/acmoates@ua.edu. Question Deadline 10/17/2023 at 5:00 PM CT Completed packets may be submitted by email to: Lane Weaver/Alexa Moates, UA Project Manager lrweaver2@ua.edu/acmoates@ua.edu and Tim Cook Jackson Renfro & Associates tim@jraee.com If necessary, hard copy submissions should be sent to: Lane Weaver/Alexa Moates, UA Project Manager The University of Alabama, Construction Administration 413 Cahaba Circle, Tuscaloosa, AL 35404 and Tim Cook Jackson Renfro & Associates 31 Inverness Center Pkway Suite 300, Birmingham, AL 35242 Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings b. Revisions to details shown on Drawings c. Depths of foundations below first floor d. Locations and depths of underground utilities e. Revisions to routing of piping and conduits f. Revisions to electrical circuitry g. Actual equipment locations h. Duct size and routing i. Locations of concealed internal utilities j. Changes made by Change Order or Construction Change Directive k. Changes made following Architect's written orders l. Details not on the original Contract Drawings m. Field records for variable and concealed conditions n. Record information on the Work that is shown only schematically 3. Mark Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, ASI, RFIs, and similar identification, where applicable.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.