Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 27, 2023

August 1, 2024

135 Back Rimmon Rd

Site Work

No Information to Display

$1,200,000.00

Public - County

img_map_placeholder

135 Back Rimmon Rd, Beacon Falls, CT

Subscribe to View Full Documents

Proposed work includes removal of the existing asphalt base running track, and perimeter chain link fencing and installation of a new asphalt base, urethane surfacing & perimeter chain link fencing. Work also includes various alternates for renovating the interior natural turf athletic field or completely replacing the interior field and drainage and replacing it with synthetic turf. Alternates also include installation of new pedestrian lighting and new Public Address system at the existing pressbox. The Regional School District #16 reserves the right to accept or reject any or all options, bids, or proposals. Question Deadline 09/29/2023 at 5:00 PM ET Any questions or requests for clarifications shall be submitted in writing, via. Email to adileone@region16ct.org This bid/proposal covers the requirements of Regional School District #16 and Woodland CIP in Beacon Fall, CT. Proposed work includes removal of the existing asphalt base running track, and perimeter chain link fencing and installation of a new asphalt base, urethane surfacing & perimeter chain link fencing. Work also includes various alternates for renovating the interior natural turf athletic field or completely replacing the interior field and drainage and replacing it with synthetic turf. Alternates also include installation of new pedestrian lighting and new Public Address system at the existing pressbox. . This bid/proposal covers the requirements of Regional School District #16 and Woodland CIP within the town of Beacon Falls for all the necessary trades. Bidders will include all labor, materials, equipment, supplies, and services to fulfill the requirements of these bid specifications. The Work generally includes demolition of the track surfacing, including asphalt, saw cutting and repaving, Fulldepth and asphalt depth track paving. Chain link fencing, drainage and grading, as required to accommodate the new track cross-section and elevations. Construction includes repair and re-establishment of existing subgrades, installation of a new asphalt track and resurfacing, field events as well as new perimeter fencing, asphalt walks & drainage. Alternates include various levels of restoration to the interior natural turf athletic field, and an alternate to completely replace the interior field with synthetic turf as well as alternates for a new Public Address system and Pedestrian lighting at the adjacent pathway. Refer to Alternates section and site plans for detailed breakout of alternates.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects