Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

December 25, 2023

No Information to Display

I-495

Site Work

No Information to Display

$2,739,000.00

Public - State/Provincial

img_map_placeholder

I-495, Middleborough, MA

Subscribe to View Full Documents

Location: Middleborough District: 5 Project Type: Painting - Structural MADOT - Bridge Preservation - I-495 SCOPE OF WORK The work under this contract consists of a bridge preservation at Bridge No. M-18-017 (463) and consists of furnishing all necessary labor, materials, and equipment required to perform the work described below, as well as all other related work incidental to a project of this nature. The work under this project includes the following: o Replacing the existing joint seals at the Northern, Southern, Eastern, and Western piers with new pre-compressed seals. o Replacing the existing joint seals at the median portions of the Eastern and Western piers and Beam 26 locations with new hot pour sealer. o Perform beam end repairs by encasing steel beams as shown on the contract drawings. o Replacing existing protective course at abutment approach slabs. o Constructing and extending the approach slabs through median with an asphalt and coarse aggregate apron at the Eastern and Western abutments o Cleaning abutment seats and pier caps in preparation for concrete repairs. o Perform substructure concrete repairs as shown on the contract drawings. o Perform slope paving repairs at the Eastern abutment as shown on the contract drawings. o Installing weepholes in the existing Eastern abutment backwall. o Sealing the bridge deck using high molecular weight Methacrylate. o Providing related traffic control as shown in the contract documents. o Clean (full removal) and paint steel bridge No. M-18-17(463) including bearings. Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category. The goals are applicable to both Contractor's and Subcontractor's on-site construction workforce

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.