Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

April 26, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$680,000.00

Public - County

img_map_placeholder

Multiple Locations, Klamath Falls, OR

Subscribe to View Full Documents

**As of October 26, 2023, the project is canceled. No definite date for the rebid.** Klamath County Drainage Service District (KCDSD) seeks quotations for the project 2023 Drainage Canal Maintenance Construction Services . (KCDSD) maintains a network of drainage canals located in the urban growth boundary of Klamath Falls. Each year the KCDSD identifies canals that are overgrown with vegetation and silt in the flowlines that needs to be cleaned. In addition to the ditch cleaning, the project includes minor access road earthwork, tree removal and additional work identified on the plans. The KCDSD recommends the quote provider walks the project to understand the scope of the project requirements identified below and within the project plans. Normal drainage canal flows reduce after the October 15th irrigation shut down. This is a "County" Project and is subject to Oregon Bureau of Labor Industries (BOLI) prevailing wage rates KCDSD) maintains a network of drainage canals located in the urban growth boundary of Klamath Falls. Each year the KCDSD identifies canals that are overgrown with vegetation and silt in the flowlines that needs to be cleaned. In addition to the ditch cleaning, the project includes minor access road earthwork, tree removal and additional work identified on the plans. B. The KCDSD recommends the quote provider walks the project to understand the scope of the project requirements identified below and within the project plans. C. Normal drainage canal flows reduce after the October 15 th irrigation shut d

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects