Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

January 17, 2024

July 3, 2024

7941 Glades Rd

Renovation

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

7941 Glades Rd, Boca Raton, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

This Project has been Withdrawn Counties: Palm Beach Road Name: Air Handler Units Replacement at Boca Tolls Data Center Limits: Midpoint Project(s): 40670935206(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 250 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 Description: The work specified in this Contract consists of providing all labor, materials, equipment and incidentals necessary to perform replacement of existing two (2) chilled water variable volume, modular air-handling units and associated chilled water system, electrical rework and ductwork modifications located at Boca Tolls Data Center, 7941 Glades Road, Boca Raton, Florida 33434, on the mainline of Florida's Turnpike (SR 91), Exit 75. No U-turns shall be permitted as a condition of this Contract, except at Service Plazas No Pre-bid Conference Will Be Held for This Project. Question Deadline 10/10/2023 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 005 Air Handler Units Replacement Project has been withdrawn

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.