Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 7, 2023

January 1, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Wareham, MA

Subscribe to View Full Documents

Project includes the following Work: Lining approximately 9,300 linear feet of 16-inch and 18-inch ductile iron force main pipe with a flexible fabric reinforced pipe system from the Narrows Pump Station to the Water Pollution Control Facility (WPCF); interconnections; air release manhole; gooseneck at the WPCF's headworks to create a highpoint in force main; temporary bypass pumping system; and all appurtenant work to have a complete operational system. The Town of Wareham is an Equal Opportunity Employer. Bids from Women and Minority Business Enterprises are strongly encouraged.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.