Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

December 4, 2023

No Information to Display

1511 Emerald Green Ln

Site Work

No Information to Display

$389,000.00

Public - County

img_map_placeholder

1511 Emerald Green Ln, Houston, TX

Subscribe to View Full Documents

Construction of Green Trails MUD Water Well No. 1 Rework. Question Deadline 09/27/2023 at 2:00 PM CT In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Questions will not be considered of answered after 3:00pm, three (3) business days prior to bidding. The Work. The work consists of providing the necessary labor, materials, equipment, bonds, insurance, and supervision to perform Water Well No. 1 Rework, for Green Trails Municipal Utility District. The work includes providing bonds and insurance; removing and inspecting pumping equipment; sounding the lap; performing any necessary mechanical and chemical rehabilitation to the well; install new column assembly components and accessories to a pump setting of 600 feet (600'); replacing the pump, column assembly and accessories; replacing or repairing the motor; bacteriological testing; performing water well performance test; disinfecting the water well; performing water sampling and testing after water well rework; and hydro-mulching all areas within the plant site and all other adjacent areas disturbed during this construction. The Project Site. The project is located in Harris County, Texas and within the City of Houston ETJ. The Water Plant No. 1 address is 1511 Emerald Green Lane, Houston, Texas 77094.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects