Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 1, 2023

December 31, 2023

2002 SE Marine Science Dr

Renovation

No Information to Display

$39,300.00

Public - State/Provincial

img_map_placeholder

2002 SE Marine Science Dr, Newport, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of October 23, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** QUESTIONS TO: Jim Durkee 541-270-0545 Scope of Work: Provide all labor, materials, tools, lift equipment, supervision (min one company employed, full time foreman), submittals, manuals and incidentals necessary to complete all work implied by the attached scope of work you are quoting. Any deviations taken by bidder to the terms, conditions, plans, specifications, codes, etc of this RFQ shall be clearly stated and included as an attachment to the Bid Form. See Bid Form for add/alternate work if applicable General Description: Repainting of approximately 53,000sf at all common, office, and demised area gypsum board walls to match existing latex finish, 1 coating, per attached specification. Contractor to patch, repair, texture and prime damaged drywall, if any, within the scope of work as necessary. Removal and replacement of detachable items such as electrical plates, dry erase boards, wall hangings, movable furnishings and other items as necessary for a professional paint job. Schedule for Work: Start: TBD/November 2023 Completion: December 2023 Work to be performed after normal working hours between 5:00pm - 6:00am Mon - Fri and all hours on weekends. Time is of the essence. Contractor to provide estimated work duration and schedule. All attempts at improving the schedule will be made by the contractor Insurance: Upon acceptance, contractor will provide proof of proper business licensing and registration in Lincoln County, Oregon, and will maintain all required licensing and permits required by Local, State or Federal jurisdictions to perform the services of this agreement. Contractor will provide proof of business liability insurance with a minimum of $2,000,000 liability coverage and maintain required liability insurance at all times for services and their responsible employees while on Port owned property. Contractor will be fully responsible to maintain all employee workmen's compensation insurance as mandated by Local, State and Federal requirements. Contractor shall name the Port of Newport as an Additional Insured and provide a Certificate of Insurance confirming Liability and Workers Compensation with a 30-day Notice of Cancellation, prior to starting any work. Contractor shall pay any and all payroll and withholding taxes and any other sums that is required by Local, State or Federal agencies. Prevailing Wages: The Contractor may be required to pay prevailing wage rates depending upon the final total price of the project in conformance to ORS 279C.800 thru 279C.870. A current copy of Prevailing Wage Rates for Public Works contracts in Oregon is available from the State of Oregon, Bureau of Labor and Industries and is also included in Section 40 of these specifications.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.