Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

No Information to Display

100 Sanford Dr

Site Work

No Information to Display

$6,000,000.00

Public - City

img_map_placeholder

100 Sanford Dr, Athens, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The ACCGov desires to solicit Pre-Qualification Applications in accordance with the Georgia Local Government Public Works Construction Law (the "Georgia Public Works Law") from responsible Construction General Contractors. Responsible General Contractors are to provide all construction, materials, equipment and labor to complete the Sanford Stadium Sanitary Sewer Interceptor Improvements Phase 1 (Project) as generally described below: Installation of approximately 580 linear feet (LF) of 36-inch ductile iron pipe gravity sewer line and appurtenances in areas generally located near the Oconee Hill Cemetery. The planned open-cut and aerial sewer construction activities form an alignment composed of three primary segments of sanitary sewer, discussed from east to west: East Segment. The first leg of the alignment begins at an existing manhole connected to a 54-inch diameter ductile iron pipe sewer trunk line. The manhole is located within an ACCGov utility and greenway easement. This segment is approximately 25 LF and installed via open-cut methods. North Oconee River Crossing: The planned alignment crosses the North Oconee River and connects to a proposed manhole on the west bank of the river. The 36-inch restrained joint DIP carrier pipe will be housed in a 54-inch steel casing pipe on the portion of the alignment spanning the river. The aerial span will be supported by driven steel and concrete structures. This segment is approximately 210 LF. West Segment. The final leg of the alignment at the proposed manhole on the west side of the river crossing and traverses property owned and maintained by the Oconee Hill Cemetery. This segment ends at an existing manhole and is approximately 370 LF.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.