October 11, 2023
November 10, 2023
November 1, 2024
Warren Woods Rd
Paving, Site Work
No Information to Display
$200,000.00
Public - County
Warren Woods Rd, Union Pier, MI
This work consists of removing existing concrete or masonry pavement, regardless of depth, as directed by the Engineer in accordance with Section 204 of the MDOT 2020 Standard Specifications except as modified herein. The Owner anticipates that construction can begin no earlier than 10 calendar days after award or as directed by the Engineer . In no case, may any work be commenced prior to receipt of formal Notice of Award by the Department. The Contractor shall prepare and submit a complete, detailed, and signed MDOT Form 1130, Progress Schedule, according the 12SP-101A to the County Engineer The Progress Schedule shall include, at a minimum, the controlling work items for the completion of the project, as well as the planned dates or work days that these work items will be controlling operations. All contract dates including open to traffic, project completion, interim completion and any other controlling dates in the contract, must be included in the progress schedule. If the bidding Proposal specifies other controlling dates, these shall also be included in the Progress Schedule. Any Questions Regarding Bid Specifications, Please Contact Kevin Stack at 269-925-1196 X 4421 or Kstack@bcroad.org The first phase of the project shall be completed in its entirety including final site restoration and cleanup on or before June 28th, 2024. Phase 2: Sta. 90+00 to Sta. P.O.E. The second phase of the project shall begin after the completion of Phase 1, and shall be completed in its entirety including final site restoration and clean-up on or before November 1st, 2024. After award and prior to the start of work, the Contractor must attend a preconstruction meeting with the Engineer. The Engineer will arrange the time and place for a preconstruction meeting. The meeting will be conducted after project award and may be rescheduled if there are any delays in the award of the project. The named subcontractor(s) for Designated and/or Specialty Items, as shown in the proposal, is (are) recommended to be at the preconstruction meeting if such items materially affect the work schedule. Liquidated Damages shall be assessed in accordance with Section 108.10 of the 2020 Standard Specifications for Construction. The Berrien County Board of Commissioners reserves the right to reject any and all bids or make any deviations deemed in the best interest of Berrien County.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Sebewaing, MI
--
Ann Arbor, MI
Bid Date: Oct 10 2023
Lansing, MI
Bid Date: Oct 10 2023
Midland, MI
Bid Date: Oct 31 2023
Clinton Township, MI
Bid Date: Oct 11 2023
Portage, MI
Bid Date: Oct 18 2023
Northville, MI
Bid Date: Sep 28 2023
Ypsilanti, MI
Bid Date: May 05 2025
Bloomfield Hills, MI
Bid Date: Sep 29 2023
Clinton Township, MI
Bid Date: Sep 29 2023
Clinton Township, MI
Bid Date: Sep 29 2023
Livonia, MI
Bid Date: Nov 14 2023
Traverse City, MI
--
Canton, MI
Bid Date: Nov 02 2023
Livonia, MI
Bid Date: Oct 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.