Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

December 18, 2023

Multiple Locations

Site Work

No Information to Display

$426,204.00

Public - County

img_map_placeholder

Multiple Locations, San Luis Obispo, CA

Subscribe to View Full Documents

This project will repair levee damages caused by overtopping and seepage, including installation of turf reinforcement mat on the landside slopes of the south levee to restore as-built conditions. ENGINEER'S ESTIMATE: $347,534.00 All bidder Requests for Information must be submitted no later than 3:00 p.m., 5 business days prior to the bid opening date. Requests submitted after said date may not be considered. All questions pertaining to the content of this invitation to Bid must be made in writing through the Purchasing website The bidder must have either a Class A license or a combination of Class C licenses that make up a majority of the work at the time the Contract is awarded (Public Contract Code 3300). When the bidder holds a combination of Class C licenses, all work to be performed outside of the bidder's license specialties, except work that is incidental or supplemental to the licenses of the bidder, shall be performed by licensed Subcontractors in compliance with the Subletting and Subcontracting Fair Practices Act (Chapter 4 (commencing with section 4100) of Part 1 of Division 2 of the Public Contract Code) THESE DRAWINGS PROVIDE THE ENGINEERING DETAILS TO RESTORE AREAS OF LEVEE INTEGRITY IN THE ARROYO GRANDE CREEK CHANNEL BY FLOOD CONTROL ZONE 1/1A OF THE COUNTY OF SAN LUIS OBISPO FLOOD CONTROL AND WATER CONSERVATION DISTRICT. THE MEASURES INCLUDED IN THESE DRAWINGS DESCRIBE THE LOCATIONS AND QUANTITIES OF LEVEE IMPROVEMENTS WITHIN THE ARROYO GRANDE CREEK CHANNEL

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects