Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

December 1, 2023

April 28, 2024

11501 Garrison Forest Rd

Paving, Site Work

No Information to Display

$100,000.00

Public - State/Provincial

img_map_placeholder

11501 Garrison Forest Rd, Owings Mills, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Contractor shall be responsible for all work related to milling and paving approximately 2,100 Square Yards (SY) of roadway at 11501 Garrison Forest Road Depending on funding availability, there may be a possibility of additional milling and paving, between 1000 and 5000 square yards on another section of Garrison Forest Road Cemetery. This is a Small Business Reserve Procurement for which award will be limited to certified small business vendors. The Contractor shall have all project work completed and ready for complete acceptance by the Owner within One Hundred and Eighty (180) days of notice to proceed. The contractor shall pay $250.00 in liquidated damages for every day past the due date of the project that the project is not completed. Site Conditions 1. The work covered by this specification is in an occupied facility. 2. The contractor shall at all times keep the premises as clean and free from an accumulation of waste materials and rubbish. At the completion of the work, all rubbish, tools, and surplus materials shall be removed, and the work area shall be left completely clean. 3. The contractor shall leave no area unsafe or unsecure at the end of the working day. 4. It shall be the contractor's responsibility to field verify all existing conditions and dimensions prior to bidding and ordering materials. 5. The contractor is responsible for verifying all material quantities and counts. 6. It is strongly recommended that the contractor attend the pre-bid / site visit. 7. The contractor shall repair and restore to its original condition any equipment, materials, or surfaces damaged as a result of their operations during this contract. 8. The contractor shall be entirely responsible for any loss or damage to their own materials, supplies, or equipment and the personal property of their employees while they are on the job site state premises. 9. The Contractor, during the construction period may leave their essential equipment on site at their own risk. The State of Maryland will not assume any liability for any of the stored equipment. Any stored equipment, at the Owner's risk, shall be stored in a safe manner and marked with reflective barricades. The Contractor shall be responsible for any and all damages to State of Maryland and/or private property including trees, curbs, asphalt or concrete pavements, mailboxes, private yards, and signage.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.