Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2023

November 10, 2023

May 13, 2024

908 N Harrison Ave

Renovation

No Information to Display

$925,000.00

Public - City

img_map_placeholder

908 N Harrison Ave, Cary, NC

Subscribe to View Full Documents

A brief project description is as follows: Select demolition of existing interior of the 5,683 SF building while maintaining existing structural elements. New partition layout, finishes, and casework. Includes new plumbing, mechanical, and electrical work. Includes relocation and installation of an owner-provided whole-building natural gas generator. Contractors offering a proposal on this project must be licensed to do the specified type of contracting in the State of North Carolina. All bids must include a non-collusive affidavit. Contractors offering a proposal on this project must comply, and must ensure that their subcontractors comply, with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes, "Verification of Work Authorization," and must provide documentation or sign affidavits or any other documents requested by the Town of Cary demonstrating such compliance. Each proposal shall be accompanied by a bid deposit in the amount of not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instruction to Bidders. The Town of Cary reserves the right to reject any or all proposals. Select demolition of existing interior of the 5,683 SF building while maintaining existing structural elements. New partition layout, finishes, and casework. Includes new plumbing, mechanical, and electrical work. Includes relocation and installation of an owner-provided whole-building natural gas generator All questions about the meaning or intent of the Contract documents shall be submitted in writing to Alexandre Penegre, Architect, Davis Kane Architects PA, apenegre@daviskane.com Addendum #1-#2 have been issued as of 10-6-2023.

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.