Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

November 15, 2023

December 15, 2023

1006 Sam Haskell Cir

Renovation

No Information to Display

$100,000.00

Public - City

img_map_placeholder

1006 Sam Haskell Cir, Amory, MS

Subscribe to View Full Documents

GENERAL INFORMATION A. Should a bidder find discrepancies in or omissions from the drawings or specifications or be in doubt as to their written meaning, the bidder should immediately notify the Architect who will then send a written instruction or interpretation to all known holders of the documents. Neither the Owner nor the Architect will be responsible for oral instructions or any other communications not included in the documents or addenda. B. It is understood and agreed that refinement and detailing of the drawings and specifications will occur from time to time. No adjustment in the contract sum or completion date shall be made unless such refinement results in changes to the scope, quality, or function of the work not reasonably inferable or anticipatable. Notwithstanding anything contained in this Contract to the contrary, the Contractor will receive no increase in the contract sum based on the increased cost of the work resulting from change orders or increased cost of any allowance items unless the change required is beyond the scope of the work. C. The Contractor shall not use in the project any new materials containing asbestos, asbestos products, polychlorinated biphenyl (PCB), or other toxic substances. If the Contractor discovers that such substances as described herein have been specified or do exist in the project, the Contractor shall promptly notify the Architect in writing and make substitutions for these products at no cost to the Owner

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.