Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

November 20, 2023

June 18, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,484,295.00

Public - City

img_map_placeholder

Multiple Locations, Warwick, NY

Subscribe to View Full Documents

The work includes but is not necessarily limited to the following: providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: (1) Installation of signing to designate the 9.6-mile bike loop utilizing the existing roadway network. (2) Construction of a 1.6-mile off-road pedestrian trail, parking area and a 45 log stringer bridge that will span Long House Creek near Cascade Road. Signing will be installed along the off-road pedestrian trail, as well as along 3.3-miles of the local roadway network designating a shared-use for pedestrians. [Provide a description of work included. E.g. Installation of approximately 3,500 ft of sidewalks with or without curb; signing and striping including the installation of crosswalks, pedestrian traffic signal upgrades, drainage modification, resurfacing, bridge replacement, etc. Choose appropriate goal format, DBE or M/WBE, based on funding and eliminate section not applicable The DBE goal for this project is: 9% Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The Bidder to whom the Contract is awarded will be required to furnish Performance and Payment Bonds guaranteeing performance of work and prompt payment from an acceptable Surety Company for an amount not less than 100% of the accepted bid. The successful Bidder and all subcontractors must have an approved CCA-2 on file with NYSDOT prior to being awarded a contract. If the successful Bidder does not currently have a CCA-2 on file with NYSDOT, the Bidder may find the CCA-2 forms and instruction for completion online . The work will be substantially completed 110 calendar days from Notice to Proceed (NTP) and completed and ready for final payment 321 days from NTP. CR Number: 2101872 Question Deadline 10/06/2023 at 2:00 PM ET Available date Beginning September 13, 2023 Successful bidders will be required to pay prevailing wage rates on this contract. The Town of Warwick reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.