Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 5, 2026

No Information to Display

NV-28

Paving, Site Work

No Information to Display

$16,864,000.00

Public - State/Provincial

img_map_placeholder

NV-28, Carson City, NV

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of September 20, 2024, an engineer has been selected nd this project is in the design development phase. Construction is not expected to start until 2026. *The closed solicitation has been included below for reference: The project includes design of transit, trail, and parking improvements at Chimney Beach (~130 spaces) and Secret Harbor (~120 spaces). Chimney Beach includes a pedestrian actuated signalized crossing on SR 28, .9 miles of trail, a prefabricated bridge at Marlette Creek, and vista points. Transit pullouts at Thunderbird Lodge, Chimney Beach, and Secret Harbor. Signage extension of the No Parking Zone from just north of the IVGID pump station to the chain control sign/pullout south of Secret Harbor is included. NEPA is complete. Construction to begin in 2026 Any questions raised by Proposers must be submitted via email to jallen@tahoetransportation.org no later than 3:00 p.m. PST, on October 5, 2023. Only questions or requests submitted by the deadline will be considered. No requests for additional information or clarification to any other TTD office, consultant, employee, or the Federal Highway Administration (FHWA) will be considered. Responses to questions regarding the RFP, including requests for clarification and requests to correct errors, will be posted on TTD's website on or before October 12, 2023. DBE Goal: 6.0% (5 points): Submittal of completed Attachment C - DBE Commitment to Subcontractors, DBE Certificates, and DBE Commitment Letters per Section VII will satisfy a response to this Evaluation Factor, and will not count towards the maximum allowable pages. Phase 1 Work (30% design & environmental analysis) December 15, 2023 May 1, 2024 Phase 2 Work (60% design) April 1, 2024 July 31, 2024 Phase 3 Work (final design) June 30, 2024 September 30, 2024

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.