Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

November 1, 2023

August 30, 2024

1100 Beaver Dr

Renovation

No Information to Display

$327,394.00

Public - City

img_map_placeholder

1100 Beaver Dr, Pincher Creek, AB

Subscribe to View Full Documents

The Town of Pincher Creek’s (the Town) Water Treatment Plant (WTP) provides drinking water to the water distribution system in the Town. Potable water is pumped to the Town’s water distribution system using two sets of vertical turbine pumps. The first set consists of two pumps operating at low head. The second set includes three pumps installed in 1992, operating at high head and that need to be replaced. The Town intends to carry out a portion of the improvement works inside the WTP. The scope for the improvement works includes the following: 1. All Permitting, Bonds, Warranties required for the project. 2. Removal of the existing three vertical turbine pumps operating at high head. 3. Supply and install new three vertical turbine pumps. 4. Removal of existing fluoride dosing pump and replace with identical pump in the same place. 5. Removal of existing two filter turbidimeters and replace with identical turbidimeters in the same place. 6. Replace the existing Pressure Relief Valve and installation of a new Pressure Transmitter on the pump station main header. 7. The electrical and controls for the new three pumps, for the fluoride dosing pump and for the turbidimeters will be installed and re-connected to the electrical and controls for the WTP building. The electrical and controls connections will be completed by the Town’s electrical contractor “Candu Automation and Control Solutions ltd”. The Contractor will be responsible for any coordination with Candu Automation and Control Solutions and will carry out the required site coordinate to complete the new electrical/programming work in parallel with the installation of the new pumps and equipment. 8. Complete all the required structural and piping work for the installation of the described works above. 9. Commissioning of the installed works under the project. Documents can be obtained from https://pinchercreek.bidsandtenders.ca/

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.