Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 6, 2023
November 1, 2023
August 30, 2024
1100 Beaver Dr
Renovation
No Information to Display
$327,394.00
Public - City
1100 Beaver Dr, Pincher Creek, AB
The Town of Pincher Creek’s (the Town) Water Treatment Plant (WTP) provides drinking water to the water distribution system in the Town. Potable water is pumped to the Town’s water distribution system using two sets of vertical turbine pumps. The first set consists of two pumps operating at low head. The second set includes three pumps installed in 1992, operating at high head and that need to be replaced. The Town intends to carry out a portion of the improvement works inside the WTP. The scope for the improvement works includes the following: 1. All Permitting, Bonds, Warranties required for the project. 2. Removal of the existing three vertical turbine pumps operating at high head. 3. Supply and install new three vertical turbine pumps. 4. Removal of existing fluoride dosing pump and replace with identical pump in the same place. 5. Removal of existing two filter turbidimeters and replace with identical turbidimeters in the same place. 6. Replace the existing Pressure Relief Valve and installation of a new Pressure Transmitter on the pump station main header. 7. The electrical and controls for the new three pumps, for the fluoride dosing pump and for the turbidimeters will be installed and re-connected to the electrical and controls for the WTP building. The electrical and controls connections will be completed by the Town’s electrical contractor “Candu Automation and Control Solutions ltd”. The Contractor will be responsible for any coordination with Candu Automation and Control Solutions and will carry out the required site coordinate to complete the new electrical/programming work in parallel with the installation of the new pumps and equipment. 8. Complete all the required structural and piping work for the installation of the described works above. 9. Commissioning of the installed works under the project. Documents can be obtained from https://pinchercreek.bidsandtenders.ca/
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Oct 28 2023
Pincher Creek, AB
Bid Date: Sep 30 2024
Pincher Creek, AB
--
Pincher Creek, AB
Bid Date: Sep 07 2023
Edmonton, AB
--
Edmonton, AB
--
Calgary, AB
Bid Date: Oct 05 2023
Calgary, AB
Bid Date: Oct 05 2023
Caroline, AB
Bid Date: Oct 03 2023
Grassy Lake, AB
Bid Date: Sep 29 2023
Acadia Valley, AB
--
Calgary, AB
--
Fort Saskatchewan, AB
Bid Date: Oct 24 2023
Calgary, AB
Bid Date: Sep 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
