Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 2, 2023

January 31, 2024

4093 Ironbound Rd

Renovation

No Information to Display

$139,990.00

Public - County

img_map_placeholder

4093 Ironbound Rd, Williamsburg, VA

Subscribe to View Full Documents

The Work under this Project consists of the removal of current EPDM roof and sections of insulation board down to the existing deck. Contractor must provide daily temporary dry-in measures for inclement weather. Installation of new fully adhered EPDM membrane roof system on mechanically fastened polyiso roof insulation by Versico or equivalent and any other work required as specified in the Contract Documents, shown on any Drawings, Photos or otherwise required to complete the work of this contract in accordance with the Contract Plan/Drawings and Specifications. All supervision, labor, materials, equipment, tools, and other appurtenances and/or incidentals required, and any other work required as specified in the Contract Documents, shown on the Drawings, Photos or otherwise required to complete the work of this contract in accordance with the Contract Plan/Drawings and Specifications. Work under the contract shall begin on the date set forth in the Notice to Proceed issued by the Owner. Substantial Completion is required by 60 days after Notice to Proceed. Final Completion is required by 90 days after the date for Substantial Completion. Bonding: Bid Security in the amount of Five percent (5%) of the Bid shall be submitted with each Bid. Performance and Payment bonds for one hundred percent (100%) of the Contract will be required by the Owner prior to execution of the contract. Liquidated Damages in the amount of $500.00 per day will be assessed for failure to meet the schedule for Substantial or Final Completion

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects