Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

August 1, 2024

60 Lees Creek Rd

Renovation

No Information to Display

$175,375.00

Public - County

img_map_placeholder

60 Lees Creek Rd, Asheville, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Work shall consist of furnishing all labor, taxes, materials, equipment, services, permits, incidental and implied, to install a complete working system as designed per the attached drawings and specifications. Work shall consist of furnishing all labor, taxes, materials, equipment, permits and services, incidental and implied, for the completion of work as described herein. The General scope of the project is to accomplish the following: 1. Remove the existing indoor and outdoor units. 2. Modify outside curb if necessary. 3. Supply and install new indoor and outdoor units as specified and per manufacturer instructions and guidelines. 4. Install new line sets from indoor to outdoor and to be insulated with Armaflex. All outside insulation shall be metal wrapped. 5. All wiring, accessories, disconnects shall be included. 6. All additional ductworks shall be properly insulated. 7. All low voltage wiring shall be in conduit. 8. ALC control integration is part of this bid but must be performed by Harris, (Sole source for BCS) Contact Chuck Still (828 651-9496) 9. Factory Start-up, Adjustment test report shall be part of this contract. Two digital copies of the completed factory start-up sheet, installation, operation and maintenance manuals shall be delivered to the owner on USB thumb drives before final payment will be made. 10. All old equipment, piping, wiring and duct shall be removed

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.