Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

October 27, 2023

No Information to Display

454 College Hwy

Renovation

No Information to Display

$31,796.00

Public - City

img_map_placeholder

454 College Hwy, Southwick, MA

Subscribe to View Full Documents

Police Station Slate Roof Repairs Plans/Specification Available 9/7/23 Question Deadline 09/20/2023 at 5:00 PM ET The project scope consists ofselective slate tile replacement and gutter system repair. The intent is to provide a sound roofsystem that is leak free and weathertight. At project completion the Contractor is to provide a written guarantee that covers defects in workmanship and materials for a period of 1 year for all work performed under this contract. 1. All work is to be coordinated with others performing carpentry & painting work on the cupola. 2. Furnish all materials and equipment for general conditions required under this scope of work. 3. Furnish, erect maintain and remove, when directed all scaffolds, staging and rigging where required for roof and gutter system repairs. 4. Removal of up to 50 slate tiles and replace with new ofthe same grade and color. 5. Repairs to the front inside seams ofthe gutters that have opened up. EPDM flashing tape is to be used over the open seams only. 6. Straighten a bend in the front gutter ensuring that the integrity ofthe gutter is maintained. 7. Insert a new drip edge extension under the existing one at the bell tower roofto prevent water from getting behind the existing dripedge. 8. The lower copper roofat the bell tower is to be replaced with a new 20oz. copper flat lock seam roof. All seams are to be fully soldered and flashing is to extend up the walls a minimum of 4 inches. 9. One soil pipe flashing is to be resealed at the pipe to flashing connection. 10. The wall flashing at the rear flat roofneeds to be resealed. Existing sealant is to be removed, any loose counter flashing refastened, and the joint resealed.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects