Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 1, 2023

December 31, 2024

2010 1st St

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

2010 1st St, Lincoln, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The City is looking to hire a Prime consultant to be responsible for coordination of all required sub- consultants (single point of contact). The purpose of the master plan verification is to validate the facilities, programs and services in the master plan concept prepared during the grant application process. The plan will serve to guide the City in a capital implementation plan. Professional Services are anticipated to include project management, master plan verification, presentations, environmental review and related services for CEQA compliance, preparation of construction documents for Phase 1 implementation and respective cost estimates, although additional tasks may be required Direct any questions regarding this RFP to Araceli Cazarez by email at Araceli.Cazarez@lincolnca.gov. All questions and requests for clarification must be received no later than 5 pm on the date noted in the Schedule above. Revisions may be provided via an Addendum. Do not contact any other City staff or consultants in the City. Meetings will not be held with proposing consultants to discuss this project. Failure of the proposed to be aware of the addenda or failure to return signed addenda with the Proposal in a timely manner as a complete responsive proposal, may be cause for rejection at the sole discretion of the City. Verbal conversations with any person will not modify any term or obligation of this RFP. Questions Due: October 12, 2023 05.00 PM Final selection of Consultant:.October 2023 Negotiate and finalize Contract for Services: by October 30, 2023 City Council to Authorize Contract:November 14, 2023 PROPOSALS MUST BE RECEIVED at the time and date stated on the cover sheet of this proposal and at the aforementioned location. Proposals received after this time or at any other location will be deemed unresponsive and rejected. The duration of services required is anticipated to be generally from December 2023 through December 2024. The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.