Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2023

October 23, 2023

February 23, 2024

Arrowcreek Pkwy

Paving, Site Work

No Information to Display

$460,634.00

Public - County

img_map_placeholder

Arrowcreek Pkwy, Reno, NV

Subscribe to View Full Documents

**As of October 18, 2023, project was awarded to M4 Engineering LLC, awarded amount is $460,633.88. ** Question Cutoff Date: 9/29/2023 05:00 PM (ET) Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment and incidentals required for completion of the improvements as shown on the Drawings. This shall include, but not be limited to: Installation of 700 lf of restrained and unrestrained 8-inch polywrapped ductile iron pipe including sawcutting, excavation, bedding and backfill. Temporary and permanent asphalt patching is also included. Traffic control for the work will also be included. All content viewed and/or downloaded is consider confidential information and shall be used by the Recipient solely for the purpose of evaluating and potentially submitting a bid for the Project, and not in any way detrimental to TMWA. Recipient shall not copy or otherwise reproduce any confidential information and may not distribute any information to any third-party that is not necessary for purposes of evaluating and submitting a bid for the Project. The Engineer's estimate is: $990,000 - $1,210,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Project is deemed a Horizontal Construction Project. Questions Due Date : 9/29/2023 02:00:00 PM (PT) Questions regarding this solicitation must be submitted through the Questions Tab no later than three (3) business days before the Bid Opening.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.