Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

April 1, 2024

May 23, 2024

1598 Milton Rd

Site Work

No Information to Display

$70,000.00

Public - State/Provincial

img_map_placeholder

1598 Milton Rd, Napa, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Provide all labor, tools, equipment, materials, incidentals, permits and taxes necessary to remove the existing sediment fill within the well, assess the well for possible obstruction, removal of obstruction (if warranted), well video survey, and installation of cement within the well structure for destruction of the well. Location of Services: Napa Sonoma Marshes Wildlife Area Edgerly Island, Milton Road, Napa, CA 94559. Estimated Cost: $ 70,000.00 Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 3%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 3% DVBE participation requirements. Refer to the Instructions to Bidders. Small Business Preference and Small Business Subcontractor participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a copy of your certification must be submitted with the bid proposal). As of March 1, 2015, Senate Bill 854 requires that No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations for projects greater than $25,000.00. Failure to register with DIR or list sub-contractors not registered will render your bid non-responsive. Contract Term Date: Upon DGS approval until June 29, 2024. For general questions pertaining to the bidding requirements, please contact Engineering at 916-539-4060. For Engineering questions, please contact Bryan Demucha at (916) 531-4716 or Email; Bryan.Demucha@wildlife.ca.gov. Construction shall be completed within THIRTY (30) WORKING DAYS following the official "Notice of Start Date" from the State to the Contractor to commence construction. Additional working days will be allowed for delays caused by unexpected changes including but not limited to supply chain or natural force. Contractor must advise Engineer IN WRITING of unexpected changes and obtain CDFW approval before any delays occur.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.