Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 11, 2023

November 5, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$12,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Port Arthur, TX

Subscribe to View Full Documents

Remove and dispose of trees, stumps, brush, roots, logs, vegetation, rubbish and other objectionable matter from project area. Project area is defined as all easements and that portion of street rights-of-way necessary to allow construction of the facilities proposed in this Contract, including those areas needed for disposal of excess excavated material. Within the limits indicated, or in areas where existing grade is altered, strip existing topsoil to 6-inch depth and stockpile in approved areas for subsequent replacement. Remove and dispose of all vegetation, roots, and waste material. Placing and compacting approved materials to required lines, grades, and crosssections as shown on PLANS. Any class of laborers or mechanics which is not listed in the wage determination, and which is to be employed under the Contract will be classified or reclassified conformably to the wage determination by the OWNER. Owner Reserves the Right to Reject Any or All Bids and To Waive Any Informalities in the Bidding. In Addition, the Owner Reserves the Right To Award the Contract on the Basis of Total Amount Bid or Total Amount Bid With Substitution(s) Or Total Amount Bid Plus Any Alternate(s) Described Above Which Is Most Advantageous to the Owner. Bids shall be accompanied by a bid guarantee of not less than five percent ( 5%) Check or Cashier's Check payable without recourse to the CITY OF PORT ARTHUR, or a bid bond with corporate surety authorized to conduct business in Texas. Said security shall be submitted with the understanding that it shall guarantee that the Bidder will not withdraw his bid within sixty (60) days after the date of the opening of the bids

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects